This combination protocol has been produced in response to several hundred reader suggestions we received in our ‘Suggestions Section’. It has been carefully designed to make it the preferred choice for Process and Laboratory stand alone equipment. It is interactive, easy to use and suitable for all mixes of equipment with and without software.
The IQ section establishes documented verification that key aspects of the equipment adhere to approved design intentions and that the recommendations of the manufacturer have been suitably considered. The OQ section establishes that there is documented verification that the installed system functions as specified and that there is sufficient documentary evidence to demonstrate this. The PQ section gives documented verification that the equipment performance in its normal operating environment is consistently exactly as specified in the URS.

Equipment Combined IQ/OQ/PQ Protocol (Issue-2). -- $159.00

Quantity


Validation Risk Assessment (Issue10.) -- $125.00

This popular Validation Risk Assessment (VRA) has now been edited and enlarged to include Part 11 assessment tables for you to use in classifying which of your predicate records require to be stored in compliance with 21 Part 11, and which do not. It also includes an Excel spreadsheet to allow you to establish a permanent record of all such judgements, as is now mandated by the regulatory authorities.


Quantity

Combined IQ / OQ Protocol.
New from Validation Online a Combined almost ready to use; IQ-OQ protocol. Designed to cover equipment in general and specifically laboratory type equipment, with or without embedded or programmable software. This is not a list of chapter headings. It is a fully detailed interactive IQ and OQ protocol.


Combined_IQ-OQ_Issue-1 -- $125.00
Quantity

Are you ready for an inspection?

With HEPA filters, the manufacturers recommended dirty filter change pressure differential (PD), is only correct if the filter is used at exactly the the same air flow as the makers specify. If there is any digression (there is often as much as 50% digression) then the makers PD must be corrected. If this is not carried out you can compromise the integrity of your room / machine pressure regimes. As you are no doubt aware this would be a very serious state to be in. There are also health and safety problems that can arise, if personnel are not getting the air flow protection that is sometimes designed into the system. This test script is not in the standard OQ, and is only available here as a download.  Regulators ask to review your writen justification for these filter change PD's; make certain you have them.

Purchase your copy of this test script now at Special Price of $22.00.
Quantity


The SOP for Equipment Validation continues to be an extremely popular document. This document leads you through the validation process, from the URS to the final P2Q.
Purchase your copy now at Special Price of $22.00.